The project
The work consists of identifying the typologies present along the route, based on cadastral survey, existing physical and morphological occupation features, and the feasibility of carrying out the required interventions.
PROJECT THEMES
The proposal calls for regularizing the entire stretch and urbanizing at least one of the sidewalks, based on in-situ assessment, providing it with all the content and comfort required for proper functioning: an 80 cm technical strip that houses traffic signage, public lighting poles, and street furniture, and a 120 cm sidewalk (pedestrian strip) shared with cyclists.